INSTALLATION OF 400 Hz, FIXED GPU AT KARACHI INTERNATIONAL AIRPORT
Installation of a 14-gate, 400 Hz Fixed Ground Power System at the Jinnah Terminal at Karachi International Airport. The systems installed at Karachi Airport consist of four 312KVA rotary frequency converters, feeding two satellites. The installation included all distribution from the 50Hz supply through to the cable retrievers on the air-bridge.
Following jobs done:
- Supply & Installation of Cable Trays.
- Cable Laying, Dressing, Tagging & Testing
- Installation of Cable retrievers on all 14 air-bridges.
- Termination and testing of cables
- Supply of all local Electrical Installation Material
Client: Houchin Aerospace Ltd-UK / Hassan International Pakistan